Meridian Port Services
  • HOME
  • ABOUT US
    • Company Information
    • Sustainability
    • Innovation
    • Working Hours / Days
  • OUR OPERATIONS
    • Terminal Capacity
    • Equipment
    • Terminal/ Gate Procedures
    • Safety
  • PROJECTS
    • Tema Port Expansion Project
    • Tema Expressway Project
  • PORTAL
    • MPS Pay Gate
  • MEDIA
    • Press Releases
    • Photo Gallery
    • Video Gallery
  • PARTNERS
    • APM Terminal
    • Bolloré
  • CONTACT
    • Location – Google Maps
    • Contact Us
  • HOME
  • ABOUT US
    • Company Information
    • Sustainability
    • Innovation
    • Working Hours / Days
  • OUR OPERATIONS
    • Terminal Capacity
    • Equipment
    • Terminal/ Gate Procedures
    • Safety
  • PROJECTS
    • Tema Port Expansion Project
    • Tema Expressway Project
  • PORTAL
    • MPS Pay Gate
  • MEDIA
    • Press Releases
    • Photo Gallery
    • Video Gallery
  • PARTNERS
    • APM Terminal
    • Bolloré
  • CONTACT
    • Location – Google Maps
    • Contact Us
January 16, 2019  |  By Leonora Akpey In NEWS

ENERGISING THE NEW PORT

In October 2017, MPS awarded EIFFAGE GENIE CIVIL the contract to undertake land and civil works. This included the Power works Supply (MV &LV) and Power Distribution  Network for 12MVA at 20kv including ducting, bus bar installation, cabling, lighting poles, reefer racks etc.

To ensure minimum loss of operational productivity for the new Container Terminal the design incorporated a power station that is capable of providing power for the entire Operations of all Gantry Cranes (Quay and Yard cranes) and ancillary equipment including all buildings and facilities (Administration, Workshop, Gates, platforms etc.).

The main incoming power is provided by ECG and in case of loss of power, generators have been sized for the total load of the Port including any future expansion.

The generators for Phase 1 are 4 x 3Megawatt (4 x 3MVA), which as a comparison would be capable of providing electricity to four thousand two bedroom homes with some air-conditioning.

The Generators

The system between the ECG mains power and the generators is fully automatic i.e. in the event of an ECG main failure the generator will start automatically and provide electricity to the port until the ECG mains power is restored.

The 20kv MV Switchroom

As works progress at the Port, the first batch of the newly installed cranes were recently connected to the ECG permanent mains power. The lights of the cranes can now be sighted from a far distance within the Tema Township.

  • The cranes at night.

Our commitment to sustainability

As world organisations become more conscious of the need to improve efforts aimed at conservation of the environment. MPS is not left out with its commitment to reduce carbon foot prints by investing in fully electrified Ship to Shore cranes and e-RTGs.

The acquisition of these cranes means that there will be less dependence on diesel which causes the release of pollutants into the air in line with the UN SDG Goal 13.

At the end of it all, as MPS makes room for increased trade and economic opportunities, it also focuses on lessening the challenges of climate change for a healthier future.

Share this:

  • Click to share on Twitter (Opens in new window)
  • Click to share on Facebook (Opens in new window)
  • Click to share on Google+ (Opens in new window)

Related

Previous StoryULTRA MODERN CRANES ARRIVE AT TEMA PORT EXPANSION PROJECT
Next StoryOUR PEOPLE: THE MPS RESOURCE ENGAGEMENT CULTURE

Related Articles

  • PARLIAMENTARY SELECT COMMITTEE ON ROADS AND TRANSPORT VISITS TEMA PORT EXPANSION PROJECT
  • TEMA PORT EXPANSION PROJECT RECEIVES 27 GANTRY CRANES

Leave your comment Cancel Reply

(will not be shared)

CATEGORIES

  • BLOG (1)
  • NEWS (29)

ARCHIVES

  • February 2019 (2)
  • January 2019 (2)
  • December 2018 (6)
  • November 2018 (2)
  • August 2018 (1)
  • July 2018 (1)
  • June 2018 (1)
  • February 2018 (2)
  • December 2017 (2)
  • November 2017 (2)
  • October 2017 (2)
  • August 2017 (2)
  • April 2017 (1)
  • March 2017 (1)
  • February 2017 (1)
  • November 2016 (1)

CALENDAR

February 2019
M T W T F S S
« Jan    
 123
45678910
11121314151617
18192021222324
25262728  

TAGS

MPS

COME VISIT US

Let’s start talking about your project or idea and find out how we can help your business grow.

Meridian Port Service Limited
P.O. Box TT240, Tema New Town - Ghana
Tel: +(233) 307 085 006
Email: mps-info@mps-gh.com

MORE ABOUT US

MPS is widely recognized by all shipping lines as the best performing container port in West and Central Africa. Over the years, we have considerably invested in Tema Port infrastructure, equipment and manpower training.

Search

en_USEnglish
en_USEnglish